CALL US TODAY: 727-501-6176

Production Facilities

November 22, 2009 by admin  
Filed under Featured Projects

Tropicana Orange Juice experienced collapsed cast iron pipes in their main 150’ long waste line during peak production season. Downtime was costing them $40,000- $60,000 per day.

Plumbers recommended bypass pumping to handle the flow while they cut out floors, pipes, re-piped and re-poured concrete. Estimated duration was 7 days. Cost $23,000.

We cut a small 2’x2’ hole in the floor, shot a new liner, refilled and repaired the floor. Duration 1 day.Cost: $11,253.

  • Call Today: (727) 501-6176
    TAMPA / MIAMI / SARASOTA / ORLANDO / WEST PALM / BOCA / NAPLES / WASHINGTON DC / NEW YORK CITY

Comments are closed.